Construction Change Order 1.0.36 Apk

Construction Change Order 1.0.36 icon
Category: Business
Requires: Android 4.4 and up
Curent version: 1.0.36
Updated: 12.12.2018
Price: Free
Size: 12.18 Mb
Download: 224

Rate saved, Thank!

4.5 (1 votes)

Description of Construction Change Order

Construction Change Order App was specifically designed for employees working in the construction industry to create quick construction change order requests and provide them to selected supervisors for reviews. The app allows users to instantly fill in specific details including information about labor, equipment, parts, construction sites, date and timestamps, upload PDF documents, take pictures, perform specific calculations etc. The app can be 100% customized by Snappii. With the help of the Construction Change Order App workers can create change orders on the spots, make a list of supervisors, assign orders to them, track supervisor's feedback and proposed changes in case of rejections. Employees can easily track if their order was accepted or denied and re-make orders on demand. Due to the in-built calculator it is simple to estimate total hours and costs needed to complete a particular project. That definitely saves time and expenses as well as improves accuracy and eliminates paperwork. Any order will be securely stored on user's device and can be emailed, uploaded to cloud drives or printed out as a PDF form. Moreover, users can upload their own fillable PDF forms to collect specific information as an additional option. The uploaded files will be saved into the library of templates that can be re-used multiple times and shared. Construction Change Order App will enable users to: - make construction changes orders on the go - work offline and online - save collected orders on a device - sync completed orders across multiple devices - track order statuses - remake orders on demand - make specific calculations - share PDF files - add supervisors - make reviews and comment on them - upload custom PDF forms - custom search by orders By downloading, you agree to the Terms of Use at https://www.snappii.com/policy In addition to using free Construction Change Order App version you can get unlimited number of form submissions by subscribing via an optional In-App Purchase and remove all ads by purchasing onetime fee. Subscribe from your device and access these services via mobile app. In-App Subscription Details: • Monthly Unlimited Form Submission Subscription to get is $19.99 US dollars per month • Annual Unlimited Form Submission Subscription to get is $199.99 US dollars per year • Payment will be charged to Account at confirmation of purchase • No cancellation of the current subscription is allowed during active subscription period • Account will be charged for renewal automatically If you are not satisfied with our pre-built mobile form, we can 100% customize it as well as redesign the app to meet your specific business needs.

Read more...

Images

Share this App

Also from Snappii

Similar apps

Heroes of Order & Chaos 2.1.1a Apk

Heroes of Order & Chaos

Strategy
Gameloft
28.13 Mb
Download Apk
Order & Chaos Duels 1.7.5o Apk

Order & Chaos Duels

Card
Gameloft SE
24.76 Mb
Download Apk
Order & Chaos Online 3D MMORPG 4.2.5a Apk

Order & Chaos Online 3D MMORPG

Role Playing
Gameloft SE
37.04 Mb
Download Apk
The Secret Order 8 1.0 Apk

The Secret Order 8

Adventure
Artifex Mundi
85.53 Mb
Download Apk
The Secret Order 5: The Buried Kingdom 2.2 Apk

The Secret Order 5: The Buried Kingdom

Adventure
Artifex Mundi
34.04 Mb
Download Apk
3D Parking Construction Site 1.1.1 Apk

3D Parking Construction Site

Simulation
Transylgamia
39.82 Mb
Download Apk
Construction Crane 3D Parking 1.1.0 Apk

Construction Crane 3D Parking

Strategy
Transylgamia
39.85 Mb
Download Apk
Construction Trucker 3D Sim 1.1 Apk

Construction Trucker 3D Sim

Simulation
Tapinator, Inc. (Ticker: TAPM)
44.28 Mb
Download Apk
Construction Truck Simulator 1.0 Apk

Construction Truck Simulator

Simulation
Top Simulator
18.31 Mb
Download Apk
construction crane 3D 1.0 Apk

construction crane 3D

Racing
Top Simulator
20.98 Mb
Download Apk
Order & Chaos 2: Redemption 1.0.0n Apk

Order & Chaos 2: Redemption

Role Playing
Gameloft
33.28 Mb
Download Apk
Construction Excavator Sim 3D 1.0.2 Apk

Construction Excavator Sim 3D

Simulation
Kick Time Studios
49.27 Mb
Download Apk
Construction Crane Operator 3D 1.1 Apk

Construction Crane Operator 3D

Simulation
Game Unified
33.38 Mb
Download Apk
City Construction Road Builder 1.5 Apk

City Construction Road Builder

Simulation
Vital Games Production
44.98 Mb
Download Apk
City Construction Heavy Roads 1.3 Apk

City Construction Heavy Roads

Simulation
Vital Games Production
49.63 Mb
Download Apk
About Privacy Policy Feedback Report a policy violation